- CUSTOMER: TECNICAS REUNIDAS (TECREUN) – GALP
- PLANT LOCATION: SINES, PORTUGAL
- PROJECT: RECONVERSAO DE RAFINERIA DE SINES
- PROCESS: VGO HYDROCRACKER UNIT
- TECHNICAL DATA & DESIGN DETAILS:
- FIRST STAGE FURNACE – DOUBLE FIRED HB – 18 MW
- SECOND STAGE FURNACE – DOUBLE FIRED HB – 15 MW
- FRACTIONATOR – VERTICAL BOX – 61 MW
- WEIGHT: 160 TONS & 220 TONS
- SCOPE OF WORK: DESIGN, ENGINEERING, PROCUREMENT
- LOCAL PREFABRICATOR: AMAL SA
- PROJECT SCHEDULE: 18 MONTHS
- START UP: 2012