Technicas Reunidas VGO Hydocracker Unit

  • CUSTOMER: TECNICAS REUNIDAS (TECREUN) – GALP
  • PLANT LOCATION: SINES, PORTUGAL
  • PROJECT: RECONVERSAO DE RAFINERIA DE SINES
  • PROCESS: VGO HYDROCRACKER UNIT
  • TECHNICAL DATA & DESIGN DETAILS:
    • FIRST STAGE FURNACE – DOUBLE FIRED HB – 18 MW
    • SECOND STAGE FURNACE – DOUBLE FIRED HB – 15 MW
    • FRACTIONATOR – VERTICAL BOX – 61 MW
  • WEIGHT: 160 TONS & 220 TONS
  • SCOPE OF WORK: DESIGN, ENGINEERING, PROCUREMENT
  • LOCAL PREFABRICATOR: AMAL SA
  • PROJECT SCHEDULE: 18 MONTHS
  • START UP: 2012